PERFECT ORDER | Case Study

Installation:  Multiple Product – E-Commerce Distribution Center

Installation:  Leading e-commerce Lingerie Apparel Company

PDFS | Product & Document Fulfillment Solution | Case Study

pdfs material handling automation

Before PDFS System

The order fulfillment and material handling was a manual process at the company. Product orders were physically scanned by the packager. An invoice was printed and inserted into the shipping bag along with the marketing materials and the garment. The laborer would physically seal the bag by hand, then print and attach the shipping label. Read More

Autoslip | Packing Slip Inserter | Case Study

autoslip

Before Autoslip System

The distribution center shipped an average of 16,800 cartons per day across a period of 2 shifts. Most of the cartons required a multi page packing slip which are manually printed, folded and inserted into a pouch and then applied by hand to the side of a box. Read More


Print Feeder | Document Feeder/Inserter | Case Study

print feeder

Before Print Feeder System

The company generated packing slips for 2,500 – 5,000 items per day. These packing slips would be produced at night. In the morning pickers would use the packing slips as pick tickets.

For 1 hour every morning, 10 people would match packing slips with the correct item and tape packing slip to each. Read More

Large Capacity Friction Feeder | Case Study

lc infeeder

Before LC In-Feeder System

The company often had several different size catalogs and other promotional literature that were manually fed into moving boxes on a conveyor line.

They were able to manually insert 1000 pieces per hour. Read More